Production schedule calculator.

Enter your delivery or air date, pick the kind of job, and adjust each phase. The calculator works backward in working days and lays the plan out on a calendar.

Your job
Working days per phase
Build it in Workback

Your dates

How to use these dates

Treat the result as your first pass at a workback schedule. Check the shoot dates against your director's and crew's availability, check the review rounds against your client's approval process, and add the milestones that matter on your job: PPM, wardrobe fittings, legal review, and traffic deadlines.

Then build it somewhere it can change. A static plan breaks the first time a date moves. In Workback, you push or pull every event after a change in two clicks, share a live link with the client, and save each version of the plan as you go.

Typical phase lengths

For a :30 broadcast spot, producers often plan about a week of creative and scripts, a week to bid and award, two weeks of pre-production, one or two shoot days, a week and a half of offline, a week of review rounds, and two or three days of color, mix, and finishing. Social sprints compress all of it. Post-only jobs start at ingest. See the full breakdown in our production schedule template and post-production schedule template.

AI connector

Or ask your assistant to build it for you.

With Workback connected, Claude or ChatGPT can plan the same workback and create the project for you.

How the AI connector works

Common questions.

It starts on your delivery date and works backward one phase at a time, in working days. Each phase ends on the working day before the next one starts. With Skip weekends on, Saturdays and Sundays don't count. With Skip US holidays on, US federal holidays don't either.

They're typical starting points for a :30 commercial, a social content sprint, a post-only job, and an episodic block. Every job is different, so change any phase to match your bid, your director's prep, and your client's review cadence.

A production schedule built backward from a fixed end date, like an air date or delivery deadline, so every milestone lands where it needs to. Read the full guide to building a production schedule.

Yes. Start a free Workback trial and build it there, or connect your AI assistant and ask it to "build a schedule" with the same phases. Workback then lets you push and pull the whole schedule when dates change.