Compare two schedule options
Present two schedules to the client from one project, then make the winner the current version.
Save a named version when the plan changes. Compare any two week by week, see who changed what, and restore an earlier point without losing the current one.
Free 30-day trial · No credit card required
History lists every edit in plain words, grouped by person: "moved SHOOT WINDOW: Apr 14 → Apr 15". Filter it by version. When you need an earlier state, restore it to a new version or a new calendar.
Present two schedules to the client from one project, then make the winner the current version.
Pre-bid, awarded, client approved, shoot moved. Each one stays exactly as it was.
Before an AI import into an existing project, or an AI delete, Workback saves a version first, so you can switch back.
The current calendar is copied into a new version, and that version becomes the one everyone sees. Earlier versions stay untouched in the version menu.
Pick two versions. Each week shows them stacked, the first on top in blue and the second below in orange, so you can see exactly what moved.
Open History to see every edit grouped by person and time. Choose Restore this point to bring it back as a new version or as a separate calendar. The current plan is never overwritten.
Yes. Keep Option A and Option B as named versions of one project and compare them side by side.